The post-mission phase is the period immediately after a USAR Team has returned home. In this phase, the USAR Team is required to complete and submit a post-mission report and conduct a lessons-learned review to improve the overall effectiveness and efficiency for a response to future disasters. The post-mission phase continuously merges into the preparedness phase.

The documents in this Technical Reference Library (TRL) section are Best Practices shared by USAR teams and INSARAG Working Groups. They are not endorsed by INSARAG and should be viewed as reference Materials. For more information on the TRL, click on this link.

This section is categorized into 7 subsections:

The demobilization phase is the period when international USAR Teams have ceased operations, commence withdrawal, coordinating their departure through the UCC/OSOCC, depart from the affected country through the RDC, and travel to their home country.

The documents in this Technical Reference Library (TRL) section are Best Practices shared by USAR teams and INSARAG Working Groups. They are not endorsed by INSARAG and should be viewed as reference Materials. For more information on the TRL, click on this link.

This section is categorized into 7 subsections:

NItemDownload LinkPOC
1UC Handbook 2022LinkTraining Working Group
2Information DisplaysLinkGRG /IMWG
3UCC Teams Assignment PlanLinkGRG / IMWG
4